jump to content immediately

Monthly Archive for March 2011

Looking at the finished lab now…

When we stand in front of the lab now, we all get a real feeling of accomplishment.  The lab looks like what we all had in our minds.  The lab is functioning just as we had hoped.  The finishing touches on the lab have really helped to attract visitors to the zoo.  The large sculpture of the Darwin’s Frog is finished and sitting next to the lab.  The massive banner that we constructed hangs in front of the lab for visitors to read in Spanish or English.  Most importantly, the frogs inside the lab are healthy and breeding.
The Darwin's Frog sculpture that artist Bernardo Oryan produced now sits to the left of the lab.

The Darwin's Frog sculpture that artist Bernardo Oryan produced now sits to the left of the lab.

Our objective with the sculpture was to bring kids to the lab...and its worked!

Our objective with the sculpture was to bring kids to the lab...and its worked!

The Darwin's Frog sculpture, just to the left of the lab.

The Darwin's Frog sculpture, just to the left of the lab.

The massive banner hanging in front of the lab really helps educate visitors about amphibian decline, the plight of Chile's amphibians, and about what our project is doing with Darwin's Frogs.

The massive banner hanging in front of the lab really helps educate visitors about amphibian decline, the plight of Chile's amphibians, and about what our project is doing with Darwin's Frogs.

admin in Uncategorized on March 21 2011 » 0 comments